top of page
NORTH-SOUTH EXPRESSWAY
PHASE 1, 2, 3 & 4

CLIENT:  PLUS

LOCATION:  Selected Locations along North-South Expressway

TYPE OF LIGHTING:

  • Highmast Lighting

  • Street Lighting

  • Under Bridge Lighting

  • Compound Lighting

  • Motorcycle Lighting

  • Dimming System

SOCPE OF WORKS:

  • Supply and Install LED Lighting

  • Highmast Aiming

  • Lighting Measurement

DESCRIPTION:

  • This project initiated in 2018 for Phase 1 and successfully completed in 2023 for Phase 4. This extensive project involved the retrofitting of outdoor lighting systems, with a focus on upgrading to LED technology, which offers significant energy savings and improved performance.

  • Phase 1 (2018-2019): Commenced with the initial assessment and retrofitting of street lighting along the mainline of the highway.

  • Phase 2 (2019-2020): Focused on upgrading lighting systems at toll plazas and mainline. This phase included the replacement of conventional lighting with energy-efficient LED highmast lighting and street lighting, significantly reducing operational costs and energy consumption.

  • Phase 3 (2020-2021): Focused on Northern Region from Hutan Kampung to Ipoh Utara. Expanded to highmast lighting, street lighting and rest areas along the highway, where under bridge lighting and additional compound lighting were retrofitted. 

  • Phase 4 (2022-2023): This phase focused on optimizing the lighting at Central Region from Ipoh Selatan to Nilai.

bottom of page