Gunung Tempurung Lay-By
Client: PLUS
Location: Gunung Tempurung, Perak
Completed In: 2019
Project Description:
a) Gunung Tempurung Lay-by is located at KM 301.10 on Southbound of PLUS North-South Expressway.
b) The scope of this project is to design, supply and install LED Lantern with the optimize LED power capacity to gain maximum saving on power consumption, supply and install SPD.